Project Descriptions
Mizpah Methodist Church
(updated 7/10/00)
Chapel on the Keys
(updated 2/25/00)
Mission House
(updated 8/9/00)
Utila Methodist Community College
(UMCC) (updated 7/10/00)
Utila Community Clinic
(UCC) (updated 7/10/00)
Paving of parking area around church sign
Fix leaking sanctuary roof
Replace Annex roof
Provide fill to seawall
Personnel Needs
Vacation Bible School: 1 to 5 days, as often as available
Personnel Needs
Vacation Bible School: 1 to 5 days, as often as available
Replace two faucets in guest bathroom
Replace one faucet in master bathroom
Install light on side porch
Repair gate
Utila Methodist Community College (UMCC)
Teachers Residence
Hard-surfaced walkway between classroom building and bodega
Teacher desks & locking cabinets
Insulation in library and science room for noise abatement
Cabinets / shelving for kitchen
Finish teacher workroom
Provide north & east side gates
Update Computer Lab with New Equipment: September
21, 1999
Paint school roof
Repair bathroom wall near sink
Repair/replace broken ceiling fan in pharmacy
Paint building exterior
Paint outside railing
Repair (minor) and paint white picket fence
Paint front room / reception area
Paint hallway
Paint three exam rooms
Paint some of the shelving